Hi
I just wired two Hot rails neck (Neck, Middle) and one Hot rail bridge in the bridge, using this diagram:
Well, the meter reads 2.64 for the middle pickup and the 2nd and 4th positions of the switch, I believe that is too low, right? The neck pu is 10+ alone and the bridge 15+, how can the...