hello, i put a SH-4 in the bridge and a 59' in the neck. with 500k pots. when i put them in i followed all the instructions down to the very last step. everything worked out great and everything worked perfect. now about a month and a 1/2 later its starting to act all weird. when i got to turn...
I have an LTD EC-500 and it has the EMG battery pups and i was wondering would it cost me more to have someone put the duncans in that i just bought?
i bought the sh-4 jb and the 59' for the neck.