Status report: bodies from Warmoth are taking an average of 12 weeks. That puts me at the 3-4 week of April.
Very cool news about your project, Mincer. Has the body, looks wise, met your expectations?
That's a gorgeous looking body. Such a contrast between the back and front too.
. . . and those are some evil looking Seths!
So far, I connected the bridge, and the body to the neck. I am taking this slow, and working on 1 small thing every time I sit down. Tomorrow is strap locks, and might get to the copper tape.
For copper tape shielding are you doing all the control cavity and pickup cavities?